Play
Ithaca's Real Rock Radio Station
Email
RSS
Twitter
Facebook
advertisement | your ad here
Honda of Ithaca - 2010
Clear
49° - Clear
 
 
Look Out for Summer Construction
April 18, 2012
No Comments Yet.
Be the first!

    

This summer, plan your routes accordingly to make traveling as easy as possible. Here are a list of road work sites in Tompkins County:

Caroline:

Besemer Road, from Route 79 to Brooktondale Road. Tree and brush removal, drainage and blacktop. Estimated cost $100,000.

Coddington Road, near Belle Road. Culvert replacement.

 Harford Road, from Slaterville Road to the Tioga County line. Blacktop and shoulder repairs. Estimated cost $150,000.

Old 76 Road, from Central Chapel Road to Buffalo Road. Pavement and blacktop repairs. Estimated cost $140,000.

Old 76 Road, from Speedsville Commons to Tioga County line. Blacktop repairs. Estimated cost $50,000.

Danby:

 Bald Hill Road, near Route 96B. Culvert replacement.

Dryden

Sheldon Road, near Bone Plain Road. Culvert replacement.

 Coddington Road, near Updike Road. Culvert replacement.

 Forest Home Drive bridge, over Fall Creek. Design and right of way $327,000; construction and construction inspection $1,662,000. Paid for by $1,532,600 federal share, $122,550 state share and $333,850 local share: Tompkins County, Town of Ithaca and Cornell 

Lansing:

 Locke Road, from Breed Road to Cayuga County line. Blacktop and shoulder repair. Estimated cost $230,000.

Newfield:

 Trumbull Corners Road, from Route 13 to Horton Road. Tree and brush removal, drainage, blacktop, shoulder repair. Estimated cost $260,000.

 Newfield Covered bridge, preservation project. Design cost $70,000; construction and construction inspection $374,000. Paid for by $355,200 federal share, $66,600 state share and $22,200 local share: County, Town of Ithaca and Cornell.

Ulysses:

 Iradell Road, from Iradell Road exit. to Waterburg Road. Pavement and blacktop repairs. Estimated cost $297,000.

 Kraft Road, near Jacksonville Road. Culvert replacement.

 Seneca Road bridge replacement, over Boardman Creek. Design and right of way $90,000, construction and construction inspection $1,125,000. Paid for by $900,000 federal share, $168,750 state share and $146,250 local share: Tompkins County, Town of Ulysses.

 

Share Your Thoughts
No comments yet. Be the first!
Name
Town
Please enter the text seen in the image below:
Note: Comments by logged in Rock n' Roll Nation users will appear immediately. All others must be approved by a moderator.
Hi: 59°
Lo: 32°
Clear
Thu
Clear
59°
32°
Fri
Chance of Rain
70°
41°
Sat
Chance of Rain
64°
37°
Sun
Partly Cloudy
63°
37°
StockWatch
 
LAST
CHANGE
15,545.75
 73.01 (0.47%)
3,919.71
 10.91 (0.28%)
1,756.54
 6.77 (0.38%)
Local Stocks
103.13
 2.34 (2.32%)
126.81
 1.12 (0.89%)
13.79
 0.09 (0.66%)
80.52
 0.01 (0.01%)
112.53
 1.78 (1.56%)
49.32
 1.12 (2.22%)
Gas Gauge
Big Red Blogroll
advertisement | your ad here
Perrywinkles Jewelry